# Textiles and Garment Manufacturing

Source: [https://www.stilsan.com/en/solutions/tekstil](https://www.stilsan.com/en/solutions/tekstil)

Workshop and garment manufacturing facility solutions sized according to the simultaneous steam demand of ironing, pressing and finishing points.

## Operational requirements

Ironing tables, presses and finishing equipment may be brought into operation at different times during the same shift. Insufficient steam can lead to waiting times and inconsistent results, while an oversized system can increase investment and energy loads. For this reason, actual simultaneous usage is assessed before total connected power.

- Number of ironing, pressing and other consumption points
- Equipment operating simultaneously and shift schedule
- Line distance, pipe diameter and condensate drainage

## How does the solution work?

The steam generator supplies the ironing and pressing line within the specified pressure range. Appropriate piping, insulation and condensate management help steam reach the point of use more consistently. Automatic control monitors operating values and makes it easier for the operator to manage the daily process.

## Information that determines the right capacity

The machine list, consumption value per item of equipment, simultaneity, line length and planned future growth are assessed together. If there are layout constraints, a standard or custom-dimensioned body option is also reviewed. The final selection is made based on site information and the technical datasheets of the equipment.

## Installation and service

The water supply, electrical infrastructure, flue or ventilation requirements and safe service area are checked before installation. After commissioning, the facility is provided with a practical maintenance plan covering water quality, daily checks, scale management and periodic maintenance.

## Frequently asked questions

**Which generator is required for how many irons?**

The number of irons alone is not sufficient. Iron consumption, simultaneous usage rate, presses and line losses must be calculated together.

**Can it be connected to an existing steam line?**

It may be considered if the line pressure, diameter, insulation and condensate drainage are suitable. A technical check is recommended before connection.

**Can custom dimensions be made for narrow workshops?**

When the layout and service clearances are provided, a suitable standard model or custom-dimensioned option can be evaluated.

**Why is condensate important?**

Condensate accumulating in the line can affect steam quality and equipment performance. Slope, traps and drainage points should be addressed together in the project.

## Related products

- [Steam Machine](https://www.stilsan.com/en/products/buhar-makinesi): STL-001
- [Steam Machine (Custom Size)](https://www.stilsan.com/en/products/buhar-makinesi-ozel-boyut): STL-002
- [ST-1 Steam Generator](https://www.stilsan.com/en/products/st-1-buhar-jeneratoru): ST-1
