CEST-2
Technical specificationsST-2 Steam Generator
Dual-heating-element steam generator — same body and equipment as the ST-1, with twice the capacity. Equipped with a pressure gauge and pressure adjustment via a pressure switch; the safety valve and phase indicator lamps are standard. Tested at our facility before shipment; covered by a 1-year warranty.
Pricing depends on size, capacity and delivery terms.
Specifications
Technical data
- Power
- 20 kW
- Equipment
- Pressure gauge · pressostat · safety valve · phase indicator lamps
- Dimensions
- 58 × 60 × 70 cm
- Electrical
- 3-phase · 380-400 V (earth + neutral)
- Insulation
- 10 cm glass wool with felt covering
- Water inlet
- Clean water and scale control suitable for the site water are required
- Step control
- The 10 kW heating stages can be switched on independently
- Water supply
- Water supply and working pressure are controlled automatically after all connections are completed
- Outer cladding
- AISI 304 stainless steel
- Heating elements
- Twin elements
- Pressure control
- The pressostat switches the heating elements off at a gauge pressure of 3 bar(g) and back on at 2 bar(g)
- Electrical controls
- Integrated control panel mounted on the boiler; contactor control and fuse protection for heating element circuits
- Safety valve setting
- 4 bar(g)
- Steam output capacity
- 24 kg/hour
- Time to first usable steam
- Approximately 5 minutes under typical production-test conditions; very cold inlet water may add about 5 minutes
- Water and scale maintenance
- Appropriate water conditioning must be combined with regular boiler maintenance
- Pre-dispatch pressure and function test
- The pressostat is temporarily set to 4 bar(g) for a steam-pressure and visible-leak check; the 3 bar(g) cut-out and 2 bar(g) restart settings are then restored and verified
Frequently asked questions
- What is the warranty period and what does it cover?
- Our machines come with a 1-year warranty. Manufacturing defects cover parts and labor. Consumables such as scale buildup, user errors, and lifespans of seals and resistance elements are excluded.
- What is the delivery time?
- We keep standard models in stock; typically shipped within one week after order confirmation. For custom production, the period depends on requested dimensions and capacity.
- Who performs the installation?
- The machine arrives ready for connection; water and electrical connections are done by the facility's own installer, we provide remote support. In certain cases, we offer paid installation services; local dealers may intervene in export markets.
- What certifications do you have?
- We hold CE, ISO 9001, ISO 14001, ISO 45001, and ISO 10002 certificates. All certificates are available on our website.
- What are the electrical requirements?
- Standard machines operate on 3 phase, 380–400 V (ground + neutral). For different networks — e.g., 110 V for the US market — production is made upon request.
- Is the machine tested before shipment?
- Each machine is tested and approved in our facility before shipment.
- What is required for the water connection?
- Clean water connection is necessary. Water quality and scale management directly affect the device's lifespan; we explain scale, water quality, and blowdown topics in detail in our blog's maintenance guide.






