CEST-1
Technical specificationsST-1 Steam Generator
Single-heating-element steam generator. Equipped with a pressure gauge, pressure-adjustable via a pressure switch; safety valve and phase indicator lamps are standard. It is tested and approved at our facility before shipment and is covered by a 1-year warranty.
Pricing depends on size, capacity and delivery terms.
Specifications
Technical data
- Power
- 10 kW
- Equipment
- Pressure gauge · pressostat · safety valve · phase indicator lamps
- Dimensions
- 58 × 60 × 70 cm
- Electrical
- 3-phase · 380-400 V (earth + neutral)
- Insulation
- 10 cm glass wool with felt covering
- Water inlet
- Clean water and scale control suitable for the site water are required
- Water supply
- Water supply and working pressure are controlled automatically after all connections are completed
- Outer cladding
- AISI 304 stainless steel
- Heating element
- Single element
- Pressure control
- The pressostat switches the heating element off at a gauge pressure of 3 bar(g) and back on at 2 bar(g)
- Electrical controls
- Integrated control panel mounted on the boiler; contactor control and fuse protection for heating element circuits
- Safety valve setting
- 4 bar(g)
- Steam output capacity
- 12 kg/hour
- Time to first usable steam
- Approximately 10 minutes under typical production-test conditions; very cold inlet water may add about 5 minutes
- Water and scale maintenance
- Appropriate water conditioning must be combined with regular boiler maintenance
- Pre-dispatch pressure and function test
- The pressostat is temporarily set to 4 bar(g) for a steam-pressure and visible-leak check; the 3 bar(g) cut-out and 2 bar(g) restart settings are then restored and verified
Frequently asked questions
- How long is the warranty and what does it cover?
- Our machines have a 1-year warranty. Parts and labor are covered for manufacturing defects. Consumables like scaling, user errors, and parts such as seals and resistance lifespan are not covered.
- What is the delivery time?
- We keep standard models in stock; usually shipped within one week after order confirmation. For special production, the time is determined according to requested size and capacity.
- Who performs the installation?
- The machine arrives ready for connection; the facility does its own water and electrical connections with its technician, we provide remote video support. Paid installation services are provided in certain cases; local dealers may take over in export markets.
- What certificates do you have?
- We have CE, ISO 9001, ISO 14001, ISO 45001, and ISO 10002 certificates. All certificates are published on our website.
- What are the electrical requirements?
- Standard machines operate with 3 phase, 380–400 V (ground + neutral). We produce on demand for different networks — e.g. 110 V for the US market.
- Is the machine tested before shipment?
- Each machine is tested and approved in our facility before shipment.
- What is required for water connection?
- Clean water connection is required. Water quality and scale management directly affect the device's lifespan; detailed information about scale, water quality, and blowdown is provided in the maintenance guide on our blog section.






